TDU Project in Africa: Empowering Local Petroleum Waste Management

In early 2026, Beston Group successfully delivered a BLJ-16 thermal desorption unit to a client in Africa. The project aims to process oil sludge generated from local drilling operations, achieving harmless treatment, volume reduction, and resource recovery. The successful operation of this equipment marks a significant step forward for the region in sustainable oil sludge waste management. A local environmental burden has been successfully transformed into recyclable resources. Read on to learn more from the installation site.

Beston Group successfully delivered a set of BLJ-16 thermal desorption unit in Africa.

BLJ-16 Thermal Desorption Unit in Africa: Turning Oil Sludge into Value

Project Information

  • Equipment Model: BLJ-16 thermal desorption unit;
  • Configuration: Single manifold + vertical condenser
  • Raw Material: Oil sludge produced by local mining companies;
  • Processing Capacity: 15 TPD;
  • Products: Fuel oil + harmless residue;
  • Oil Sales Channel: Resold to petroleum refineries;

Project Timeline

Project Phase Time Period Days
Installation March 2, 2026 – March 31, 2026 30 Days
Commissioning April 1, 2026 – April 10, 2026 10 Days
Project Acceptance April 11, 2026 – April 12, 2026 2 Days
Total Duration: 42 Days


42 Days to Delivery: What Beston Group Did Right?

Three steps, tightly coordinated — compress variables before shipment, eliminate blockers before arrival, launch without delay on the ground. Together, they made a 42-day turnaround from engineer departure to first output possible:

1. Pre-shipment Configuration

Before pyrolysis equipment left the factory, our engineering team aligned with the solutions team on configuration details. They prefabricated key base components in advance, so the crew could skip much of the on-site casting and welding work. As a result, the team arrived on-site with a clean runway and zero wasted time.

2. Remote Pre-inspection

Next, our engineers connected with the client via WhatsApp to work through a preparation checklist together. They confirmed site infrastructure progress, verified client-supplied materials, and checked the skilled labor. As a result, problems would otherwise surface on arrival got resolved before the team ever boarded a flight.

3. On-site Verification

Finally, upon arrival, engineers ran an immediate walkthrough against the Pre-installation Checklist. They reviewed personnel readiness, cargo completeness, and tool availability on the spot. Wherever they found gaps, they addressed them immediately — so the installation schedule moved forward without interruption from day one.

Project Manager

“The installation was completed faster than we expected. Beston Group’s team was well-prepared and professional throughout the entire process.”

Installation Engineer

“The client had everything ready before we landed — site cleared, materials on hand, crew in place. That kind of preparation on their end is exactly what made the 42-day turnaround possible.”

Engineering team and client crew posed for a group photo on-site following successful commissioning(Credit: Beston Group)

Contact Us for Oil Sludge Treatment Solution

This successful delivery of BLJ-16 thermal desorption unit powerfully demonstrates rapid delivery and responsible execution in Africa can go hand in hand. As the demand for sustainable waste management solutions grows across the African market, this project sets a replicable benchmark for the rapid on-site deployment of TDUs. If you also have problems dealing with petrochemical solid waste such as oil sludge, please feel free to contact us.