Good news, Beston Group successfully installs a set of BLJ-16 pyrolysis plant in Oman. The equipment will help Oman customers to recycle local hazardous waste: oil sludge. With the joint efforts of the Beston installation team and Oman customers, the installation of the equipment goes smoothly and the trial operation is successful. The following is the specific information of the pyrolysis machine installed in Oman.

Install Pyrolysis Plant in Oman in 2024 – Process Oil Sludge
BLJ-16 Pyrolysis Plant in Oman

Configuration Information of Pyrolysis Plant in Oman

Before confirming the configuration plan, Beston team has in-depth exchanges with the Omani customer. We fully understand the customer’s raw material composition, processing volume requirements, site planning and other information. Therefore, Beston Group’s technical team is able to develop a customized plan based on the production needs of Omani customers. The specific configuration information is as follows:

  • Equipment Model: BLJ-16 pyrolysis unit;
  • Capacity: 12-16 tons oil sludge/day;
  • Feeding Method: screw feeding;
  • Condensation Method: vertical condensation;
  • Installation Time: October 2024;
  • Installation Team: 1 installation engineer + 1 project consultant for on-site installation.
Screw Feeding System
Screw Feeding System
Vertical Condenser
Vertical Condenser

Installation Team Provides Technical Support to Omani Customers

Pre-installation Planning

Before installation, the site layout is adjusted first. This ensures that the hoisting & work area of ​​the oil sludge pyrolysis plant is properly planned. In addition, the installation team arranges the responsibilities and division of labor of the staff. The installation team also arranges for Omani customers to check the tools and equipment required for installation. After ensuring that everything is ready, we develop detailed plans and safety regulations.

Component Hoisting & Assembly

The installation engineer guides the orderly hoisting of each component. This ensures that no equipment damage occurs. During assembly, the workers strictly follow the requirements of the installation engineer for connection and welding. This ensures that all installations meet quality standards. After completing the installation, the engineer conducts component docking and alignment checks to ensure that the equipment is installed firmly.

Commissioning & Operation Training

After the installation is completed, the engineer first checks the air tightness of the equipment. Then the installation team conducts a trial run test. This can detect the various functions of the equipment and the stability of the system. Finally, we train the operators of the Omani customers. This ensures that they have mastered daily maintenance and troubleshooting skills. Thus, this ensures the long-term stable operation of the pyrolysis equipment.

Installation of Pyrolysis Unit in Oman
Install Pyrolysis Machine to Process Oil Sludge in Oman

Get Exclusive Solid Waste Pyrolysis Solution from Beston Group

Soon, this set of BLJ-16 pyrolysis plant will be put into production in Oman. Please stay tuned for follow-up updates. If you also have solid waste pyrolysis needs, including plastics, oil sludge, tires and biomass, please consult Beston Group. Our professional team will provide you with exclusive customized solutions.

Contact Us

Please specify your requirement by referring to the following aspects:

1What kind of solution will meet your demand? (Key point)

2What kind of material and expected end product are you planning to have? (Right solution begins from material and product)

3When is the project supposed to be running? (Key info for A-Z project programming)

4Budget for machinery purchasing? (Key info for right model)

5Points that you really focus on. (Customized service from our project consultant)

Name(required):

Email(required):

Your Whatsapp: (required, including area code):

Country (required, Company Location):

Company(required):

Project Goals(required):

Message(required):